Xi S, Wu ZX, Gao CC, Meng YC, Pei DD, Lu Y. [Influence of preparation height and cement space on the fit and retention of computer aided design/computer aided manufacturing zirconia crown].
HUA XI KOU QIANG YI XUE ZA ZHI = HUAXI KOUQIANG YIXUE ZAZHI = WEST CHINA JOURNAL OF STOMATOLOGY 2020;
38:263-269. [PMID:
32573132 DOI:
10.7518/hxkq.2020.03.006]
[Citation(s) in RCA: 0] [Impact Index Per Article: 0] [Reference Citation Analysis] [Abstract] [Key Words] [Subscribe] [Scholar Register] [Indexed: 11/21/2022]
Abstract
OBJECTIVE
To investigate the effects of preparation height and cement space on the fit and retention of computer aided design (CAD)/computer aided manufacturing (CAM) zirconia crown, and to provide reference for the clinical design and fabrication of CAD/CAM crowns.
METHODS
3D printing system was used to fabricate resin abutment teeth with convergence angle of 2° and height of 1-3 mm. The models' optical impressions were collected by the three-shape scanner. Then, the cement spaces were set by Cradle CAD/CAM system at 10-50 μm to create an all-ceramic zirconia crown. The fit of the crowns was measured by using silicone rubber interstitial impression method. The retention of the crowns was measured by pull-off test with uniaxial tensile force after the crown was bonded. The data were analyzed by SPSS 22.0 soft-ware.
RESULTS
When the preparation height was fixed, the fitness values of different cement space groups have statistical difference (P<
0.05), whereas the retention values of different cement space groups have no statistical difference (P>0.05). The fitness values of different preparation height groups have no statistical difference (P>0.05), and the retention values of different preparation height groups have statistical difference (P<0.05) when the cement space was fixed. No interaction was observed between the cement space and the preparation height (P>0.05).
CONCLUSIONS
When cradle CAD/CAM system is used to create a full crown in the clinic, the preparation height should be set to more than 3 mm, and the cement space should be set at 30 μm.
Collapse