1
|
A Bi-Objective Model for Scheduling Construction Projects Using Critical Chain Method and Interval-Valued Fuzzy Sets. BUILDINGS 2022. [DOI: 10.3390/buildings12070904] [Citation(s) in RCA: 0] [Impact Index Per Article: 0] [Reference Citation Analysis] [Abstract] [Track Full Text] [Subscribe] [Scholar Register] [Indexed: 02/05/2023]
Abstract
Numerous constraints affect construction projects, and lack of management may lead to schedule deviation. In the execution phase of the project, due to the lack of timely access to the required resources and the existence of uncertainty, the project activities do not progress following the schedule, and as a result, schedule deviation occurs. The scheduling addresses resource constraints by the critical chain method and deals with delays in activities by placing buffers that have emerged as a method for scheduling construction projects. This paper presents a new bi-objective mathematical model which aims to reduce delay and increase quality, based on the critical chain method and resource constraint for scheduling construction projects. In the proposed model, the activities have been considered multi-mode ones. Moreover, this paper has assumed each activity to be executed in a normal or crashing way. Due to the uncertainty in real-world problems, the duration of the activity is expressed using triangular interval-valued fuzzy numbers. A new interval-valued fuzzy solution process is presented in this paper using a two-step approach. First, the equivalent crisp model is given; then in the second step, a goal programming approach is applied for transforming the bi-objective model into the single-objective one. Finally, the mathematical model is implemented on a case study adapted from the literature, and sensitivity analysis of the results is conducted.
Collapse
|
2
|
Zohrehvandi S, Vanhoucke M, Khalilzadeh M, Amiri M, Shadrokh S. A fuzzy project buffer management algorithm: a case study in the construction of a renewable project. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT 2022. [DOI: 10.1080/15623599.2022.2045860] [Citation(s) in RCA: 0] [Impact Index Per Article: 0] [Reference Citation Analysis] [Track Full Text] [Subscribe] [Scholar Register] [Indexed: 10/18/2022]
Affiliation(s)
- Shakib Zohrehvandi
- Department of Industrial Engineering, Science and Research Branch, Islamic Azad University, Tehran, Iran
- New Technologies Department, Center for European Studies, Kharazmi University, Tehran, Iran
| | - Mario Vanhoucke
- Department of Business Informatics and Operations Management, Ghent University, Ghent, Belgium
| | - Mohammad Khalilzadeh
- CENTRUM Católica Graduate Business School, Pontificia Universidad Católica del Perú, Lima, Peru
| | - Maghsoud Amiri
- Department of Industrial Management, Faculty of Management and Accounting, AllamehTabataba’i University, Tehran, Iran
| | - Shahram Shadrokh
- Department of Industrial Engineering, Sharif University of Technology, Tehran, Iran
| |
Collapse
|
3
|
An innovative interval type-2 fuzzy approach for multi-scenario multi-project cash flow evaluation considering TODIM and critical chain with an application to energy sector. Neural Comput Appl 2020. [DOI: 10.1007/s00521-020-05095-z] [Citation(s) in RCA: 2] [Impact Index Per Article: 0.5] [Reference Citation Analysis] [Track Full Text] [Journal Information] [Subscribe] [Scholar Register] [Indexed: 10/24/2022]
|