1
|
Doukari O, Seck B, Greenwood D. The Creation of Construction Schedules in 4D BIM: A Comparison of Conventional and Automated Approaches. Buildings 2022; 12:1145. [DOI: 10.3390/buildings12081145] [Citation(s) in RCA: 1] [Impact Index Per Article: 0.5] [Reference Citation Analysis] [What about the content of this article? (0)] [Abstract] [Track Full Text] [Subscribe] [Scholar Register] [Indexed: 02/04/2023]
Abstract
Building Information Modelling (BIM) is now a globally recognised phenomenon, though its adoption remains inconsistent and variable between and within the construction sectors of different countries. BIM technology has enabled a wide range of functional applications, one of which, ‘4D BIM’, involves linking the tasks in a project’s construction schedule to its object-orientated 3D model to improve the logistical decision making and delivery of the project. Ideally, this can be automatically generated but in reality, this is not currently possible, and the process requires considerable manual effort. The level of maturity and expertise in the use of BIM amongst the project participants still varies considerably; adding further obstacles to the ability to derive full benefits from BIM. Reflecting these challenges, two case studies are presented in this paper. The first describes a predominantly manual approach that was used to ameliorate the implementation of 4D BIM on a project in Paris. In fact, there is scope for automating the process: a combination of BIM and Artificial Intelligence (AI) could exploit newly-available data that are increasingly obtainable from smart devices or IoT sensors. A prerequisite for doing so is the development of dedicated ontologies that enable the formalisation of the domain knowledge that is relevant to a particular project typology. Perhaps the most challenging example of this is the case of renovation projects. In the second case study, part of a large European research project, the authors propose such an ontology and demonstrate its application by developing a digital tool for application within the context of deep renovation projects.
Collapse
|
2
|
Singh Rajput T, Thomas A. Optimizing passive design strategies for energy efficient buildings using hybrid artificial neural network (ANN) and multi-objective evolutionary algorithm through a case study approach. International Journal of Construction Management 2022. [DOI: 10.1080/15623599.2022.2056409] [Citation(s) in RCA: 1] [Impact Index Per Article: 0.5] [Reference Citation Analysis] [What about the content of this article? (0)] [Affiliation(s)] [Track Full Text] [Subscribe] [Scholar Register] [Indexed: 10/18/2022]
Affiliation(s)
- Tripti Singh Rajput
- Department of Civil Engineering, Indian Institute of Technology Bombay, Mumbai, India
| | - Albert Thomas
- Department of Civil Engineering, Indian Institute of Technology Bombay, Mumbai, India
| |
Collapse
|
3
|
Amarkhil Q, Elwakil E, Hubbard B, Byrd VL. A framework to standardize causes of construction delay. International Journal of Construction Management 2021. [DOI: 10.1080/15623599.2021.2009097] [Citation(s) in RCA: 0] [Impact Index Per Article: 0] [Reference Citation Analysis] [What about the content of this article? (0)] [Affiliation(s)] [Track Full Text] [Subscribe] [Scholar Register] [Indexed: 10/19/2022]
Affiliation(s)
- Qais Amarkhil
- School of Construction Management, Purdue University, West Lafayette, IN, USA
| | - Emad Elwakil
- School of Construction Management, Purdue University, West Lafayette, IN, USA
| | - Bryan Hubbard
- School of Construction Management, Purdue University, West Lafayette, IN, USA
| | - Vetria L. Byrd
- School of Computer Graphic, Purdue University, West Lafayette, IN, USA
| |
Collapse
|
4
|
Egwim CN, Alaka H, Toriola-Coker LO, Balogun H, Sunmola F. Applied artificial intelligence for predicting construction projects delay. Machine Learning with Applications 2021. [DOI: 10.1016/j.mlwa.2021.100166] [Citation(s) in RCA: 3] [Impact Index Per Article: 1.0] [Reference Citation Analysis] [What about the content of this article? (0)] [Track Full Text] [Journal Information] [Subscribe] [Scholar Register] [Indexed: 10/20/2022] Open
|
5
|
Sanni-Anibire MO, Mohamad Zin R, Olatunji SO. Causes of delay in the global construction industry: a meta analytical review. International Journal of Construction Management 2020. [DOI: 10.1080/15623599.2020.1716132] [Citation(s) in RCA: 9] [Impact Index Per Article: 2.3] [Reference Citation Analysis] [What about the content of this article? (0)] [Affiliation(s)] [Track Full Text] [Subscribe] [Scholar Register] [Indexed: 10/25/2022]
Affiliation(s)
- Muizz O. Sanni-Anibire
- School of Civil Engineering, Faculty of Engineering, Universiti Teknologi Malaysia (UTM), Johor, Malaysia
| | - Rosli Mohamad Zin
- School of Civil Engineering, Faculty of Engineering, Universiti Teknologi Malaysia (UTM), Johor, Malaysia
| | - Sunday Olusanya Olatunji
- Computer Science Department, College of Computer Science & Information Technology, University of Dammam, Dammam, Saudi Arabia
| |
Collapse
|
6
|
Sepasgozar SME, Karimi R, Shirowzhan S, Mojtahedi M, Ebrahimzadeh S, Mccarthy D. Delay Causes and Emerging Digital Tools: A Novel Model of Delay Analysis, Including Integrated Project Delivery and PMBOK. Buildings 2019; 9:191. [DOI: 10.3390/buildings9090191] [Citation(s) in RCA: 37] [Impact Index Per Article: 7.4] [Reference Citation Analysis] [What about the content of this article? (0)] [Abstract] [Track Full Text] [Subscribe] [Scholar Register] [Indexed: 11/16/2022]
Abstract
Delay is one of the main challenges of construction projects, and there is still much to overcome in order to reach near zero delay in all construction projects. This project aims to conduct a systematic critical review including a bibliography analysis on delay literature in construction. The main questions consider what has been learnt from a decade investigating delay causes and effects in the construction literature and what factors have been missed in the literature. This paper also presents a new and challenging question regarding how digital tools and associated technologies may prevent any delay in construction projects, which can change the research direction from delay investigations to identifying prevention factors. The paper identifies the delay dataset, including 493 papers investigating delay in construction, and establishes a specific dataset of papers focusing on delay effects and causes (DEC), including 94 selected papers covering different factors examined in over 29 countries such as Iran, India, Turkey, Bangladesh, Saudi Arabia, the United Arab Emirates (UAE), Cambodia, Oman, Malaysia, Taiwan, China, Vietnam, the US, the UK, and Egypt. In addition, the paper identifies 30 critical factors with the frequency of occurrences over three times in the DEC dataset and computes their medians of ranking. This paper also discusses digital tools and methods that can be used for delay analysis and preventions, including MS Project, Oracle Primavera P6, and Open Plan by Deltek. The paper discusses the project schedule delay analysis from project management methodology perspectives. It also discusses the current method’s limitations and future directions, which are based on the identification of the deficiency areas. In total, four overlooked factors are identified and suggested, including faulty data analysis, unmatched structure of the research questionnaires with new knowledge and standards [e.g., Project Management Body of Knowledge (PMBOK)], overlooked effects of digital technologies [e.g., Digital twin, Navisworks, Building Information Model (BIM), Geographic Information System (GIS), and Integrated Project Delivery (IPD)], and ignored job-site technologies. In addition, the paper presents the DEC model for future studies, including four main key factors. These factors are resources (e.g., project budgets, labour, material, equipment, and digital tool), project context, stakeholders performance (e.g., owner/client, consultant/designer, contractor, vendor/supplier), and external factors (e.g., ground condition, site location, regulation, natural disaster), which may significantly affect delay prevention and should be concurrently considered in the future delay investigations, since they may be required for designing an effective mitigation strategy when these proof points are identified. This would significantly help to utilise digital systems to prevent time overruns in different construction contexts.
Collapse
|
7
|
Hossain MA, Raiymbekov D, Nadeem A, Kim JR. Delay causes in Kazakhstan’s construction projects and remedial measures. International Journal of Construction Management 2019. [DOI: 10.1080/15623599.2019.1647635] [Citation(s) in RCA: 4] [Impact Index Per Article: 0.8] [Reference Citation Analysis] [What about the content of this article? (0)] [Affiliation(s)] [Track Full Text] [Subscribe] [Scholar Register] [Indexed: 10/26/2022]
Affiliation(s)
- Md Aslam Hossain
- Department of Civil and Environmental Engineering, Nazarbayev University, Nur-Sultan, Kazakhstan
| | - Dinmukhambet Raiymbekov
- Department of Civil and Environmental Engineering, Nazarbayev University, Nur-Sultan, Kazakhstan
| | - Abid Nadeem
- Department of Civil and Environmental Engineering, Nazarbayev University, Nur-Sultan, Kazakhstan
| | - Jong Ryeol Kim
- Department of Civil and Environmental Engineering, Nazarbayev University, Nur-Sultan, Kazakhstan
| |
Collapse
|
8
|
Affiliation(s)
- Mohamed Saad Bajjou
- Department of Industrial Engineering, Faculty of Sciences and Techniques, Sidi Mohamed Ben Abdellah University, Fes, Morocco
| | - Anas Chafi
- Department of Industrial Engineering, Faculty of Sciences and Techniques, Sidi Mohamed Ben Abdellah University, Fes, Morocco
| |
Collapse
|
9
|
Zhang Y, Zheng J, Darko A. How Does Transformational Leadership Promote Innovation in Construction? The Mediating Role of Innovation Climate and the Multilevel Moderation Role of Project Requirements. Sustainability 2018; 10:1506. [DOI: 10.3390/su10051506] [Citation(s) in RCA: 31] [Impact Index Per Article: 5.2] [Reference Citation Analysis] [What about the content of this article? (0)] [Track Full Text] [Subscribe] [Scholar Register] [Indexed: 11/16/2022]
|